Simple Solution for Access Roads

PROJECT: Recycled Water Integration Program LOCATION: Bomaderry NSW CLIENT: UEA PRODUCT: E’Grid® 3030GT THE REQUIREMENT Reinforcement for access roads against vehicular damage. Leading trenchless drilling contractor, UEA, needed to create two 50x50m hard pads and a 3.5x350m temporary access track for vacuum trucks and heavy contract vehicles at each of the project’s HDD (Horizontal Directional

Read More