Loading…
Skip to content
Call us on : 1300 287 484
Polyfabrics
  • Home
  • About Us
    • Privacy Policy
  • Products
    • Drainage Systems
    • Geogrids
    • Gabions & Mattresses
    • Geotextiles
    • Geomembranes
    • Paving & Grass Protection
    • Erosion Solutions
    • Geocells
    • Geonets
    • Geosynthetic Clay Liners
    • Roof & Wall Gardens
    • Sediment Control Products
  • Applications
    • Highways
    • Civil Construction
    • Landfill / Containment
    • Landscaping
    • Rail
    • Mining
    • Drainage Solutions
    • Waterways / Coastal
    • Runway
    • Grass & Ground Reinforcement
    • Sediment Control
  • Case Studies
  • Contact us
  • 0 items-$0.00

Basement Excavation & Construction for Multi-Level Residential Apartment

Posted on November 18, 2020November 24, 2020 by admin
Basement Excavation & Construction for Multi-Level Residential Apartment

Location: Fairfield NSW
Client: Budget Demolition
Product Used: Fredrain

Read More

Swan Reach Deep River Mooring Project

Posted on November 4, 2020November 4, 2020 by admin
Swan Reach Deep River Mooring Project, SA

Location: Swan Reach Boat Ramp- Swan Reach, SA
Client: Mid Murray Council
Products: 0.75m3 Sand Containers (vandal proof), RF80PVC Erosion Mat, Wire Impregnated (PVC cover)

Read More

Terram Hydrotex – Routine Corrective and Reactive Maintenance (RCRM) – Ardglen Bank

Posted on August 4, 2020October 19, 2020 by admin
TERRAM HYDROTEX®
AT ARDGLEN NSW

Project: Routine Corrective and Reactive Maintenance (RCRM)
Location: Ardglen NSW
Client: Goldspring Group / ARTC

Read More

Dual Access Pathway (Coir 9)

Posted on January 15, 2020March 4, 2020 by admin
Burns Beach to Mindarie
Dual Access Pathway

Location: Mindarie
Client: ABM Landscaping (City Of Joondalup)
Products: Coir 9

Read More

Road Upgrade
(TerraStop HVL & EGRID 3030)

Posted on January 14, 2020February 27, 2020 by admin
BRINGELLY ROAD
UPGRADE PROJECT

Location: Bringelly NSW
Client: Roads and Maritime Services / BMD
Products: TerraStop HVL ; EGRID 3030

Read More

Erosion Control & Revegetation (TecMat Jute)

Posted on November 12, 2019January 23, 2020 by admin
Koo Wee Rup, VIC

South-east of Melbourne, spanning approximately 330 square kilometres, lies the Koo Wee Rup & Longwarry (KWRL) Flood Protection District. As well as supporting major agricultural activities, its unique habitat houses some of Victoria’s threatened and endangered species.

Read More

Julia Reserve Recreational Hub

Posted on November 6, 2019November 15, 2019 by admin

TerraDrain TD10 and FlexiSeal HD were used to create an efficient cost-effective subsurface drainage system at Julia Reserve Recreation Hub, and in the process, provided a tangible reduction in emissions and environmental impact.

Read More

Polyfabrics Stabilises Aurizon Rail for Years to Come

Posted on September 24, 2019September 26, 2019 by admin

Polyfabrics supplied over 200,000m2 of EGRID3030 for 18km of track duplication between Rocklands and Stanwell on the Blackwater Rail System – a  vital link between the Wiggins Island Coal Terminal and mines in the Southern Bowen and Surat Basins.

Read More
TerraStop Tarpee System -Sydney Intermodal Terminal

Sydney Intermodal Terminal

Posted on August 13, 2019August 11, 2020 by Tapexgroup DigitalAdmin

Moorebank Logistics Park is a nationally significant infrastructure development that will transform the way containerised freight moves through Port Botany.

Read More

BASIN & WALL CONSTRUCTION

Posted on July 11, 2019October 22, 2019 by Tapexgroup DigitalAdmin
LOCATION: BORAL QUARRY, ORMEAU QLD PRODUCTS: VARIOUS (SEE BELOW)   OBJECTIVES Two basins/ponds were needed to:• capture rainwater from the surrounding land• remove silt• recycle water for use in the quarry for dust control andRead More

Posts navigation

Older posts

Recent Posts

  • Basement Excavation & Construction for Multi-Level Residential Apartment
  • Swan Reach Deep River Mooring Project
  • Terram Hydrotex – Routine Corrective and Reactive Maintenance (RCRM) – Ardglen Bank
  • Dual Access Pathway (Coir 9)
  • Road Upgrade
    (TerraStop HVL & EGRID 3030)

Recent Comments

  • August 2020 Vol. 4 - Geosynthetic News Alerts (GNA) on Terram Hydrotex – Routine Corrective and Reactive Maintenance (RCRM) – Ardglen Bank
  • March 2020 Vol. 5 - Geosynthetic News Alerts (GNA) on Dual Access Pathway (Coir 9)
  • March 2020 Vol. 4 - Geosynthetic News Alerts (GNA) on Road Upgrade
    (TerraStop HVL & EGRID 3030)
  • November 2019 Vol. 3 - Geosynthetic News Alerts (GNA) on Julia Reserve Recreational Hub
  • September 2019 Vol. 5 - Geosynthetic News Alerts (GNA) on Sydney Intermodal Terminal

Archives

  • November 2020
  • August 2020
  • January 2020
  • November 2019
  • September 2019
  • August 2019
  • July 2019
  • June 2019
  • May 2019
  • July 2018

Categories

  • Case Studies

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
 
  • Home
  • About us
  • Case Studies
  • Product Enquiry
 
  • Contact Us
  • Our Policies

Social Links

Copyright © 2020 Polyfabrics Australasia   |   Created By : FatWeb